Details of the Process

The effluent is subjected to pre-aeration , physic-chemical treatment & solid separation , aerobic treatment as Activated Sludge Process to achieve the final COD of treated effluent less than 250 mg/I.

The outlet effluent from tertiary treatment has Dissolved Solid (TDS) in the range 2500-3000 mg/I , which is more than the desired MPCB norms of <2100 mg/I . As the MPCB consent conditions , the desired outlet TDS (i.e<2100 mg/I) will be achieved by blending the treated sewage of less TDS . The required volume of treated sewage (9330 m3/day) for blending will be sourced from 29 MLD Sewage treatment plant of Ichalkaranhi Municipal Council.

Detailed Process chart of the CETP units.
Sr. Location PM10
µg/m3
PM2.5
µg/m3
SO2
µg/m3
NOX
µg/m3
CO
µg/m3
1 Project Site 55.81 27.60 10.49 13.70 0.39
2 Ichalkaranji Industrial Area 61.04 30.84 13.84 17.33 0.42
3 Yadrav 53.23 26.52 6.42 9.52 0.36
4 Shiradwad 47.73 24.00 5.84 9.21 0.36
5 Takavade 42.00 20.64 4.78 8.06 0.30
Environmental monitoring program:
Sr. Environment attribute Location Parameters Period and Frequency
1 Ambient Air Quality
  • One at center
  • One Upwind
  • One downwind
Criteria pollutants :SO2, NOX , PM10 PM2.5 24-hr average sampling (Twice a week) 3 Seasons
2 Ambient Noise In plant Noise Levels and Noise level within 0.5 km radium from CETP dB (A) Levels Leq (Night +Day) Leq (day) and Leq (Night) should be monitored once in month.
3 Treated Effluent quality CETP inlet and outlet pH Suspended Solids, Dissolved Solids, Dissolved Oxygen , COD , BOD , oil & Grease, Chlorides , Mixed Liquor Suspended Solids, Mixed Liquor Volatile Suspended Solid , S V I Daily
4 Soil quality Greenbelt area Organic matter C ,H,N, Alkalinity, Acidity , heavy metals and trace metal Pre-monsoon and post-monsoon during functional phase
5 Ground water quality Six Locations Drinking Water parameters as per IS 10500 Once in three months
6 Surface water quality Six Location Parameters as per IS 2296 Once in Three months
7 Aquatic Flora and Fauna 3 to 4 locations Phytoplankton’s (No. of species and their density), zooplanktons (No, of species and their density), Total Coli forms (TC) , E. Coli Once in Three months
8 Green belt development Around CETP site Rate of Survival and growth various species Once in Three months
9 Occupational exposure monitoring At CETP site Lung test, Audiometer test. Once a Year
Occupational Health and Safely

In CETP operations , the main safely hazards involve burns, shock , slips and falls. The proposed project may cause health problem like skin diseases to workers handling toxic effluent discharged by various industrial units.

The workers are subject to various diseases , including skin diseases. For protection from toxic material it may be made compulsory for all workers in the plant to wear masks and gloves while working in the CETP.

The plant workers may be encouraged to undergo health checkups at regular intervals in order to protect themselves from various diseases.